The second batch of bridge construction related supporting products have successfully arrived in the Philippines

Project Location: Philippines

Products: Steel strands, anchors and other bridge accessories

Specification:

12.7MM Steel Strand,

DN 70 plastic bellows,

13 holes Anchorage components

Standard:ASTM A416/06,GB/T 14370

Usage:Bridge Construction

Inquiry time:2021.12.15

Purchase Time:2021.12.23

ETD:2022.03.05

ETA:2022.03.20

The anchors shipped include clips, backing plates,anchor rings and threaded bars

We first met the customer in March 2021. The customer is a local builder in the Philippines, and successfully cooperated with a steel pipe order in early May, which laying a good foundation for the later cooperation. Recently, the client has expanded new projects and contracted the construction of bridge. After a week of negotiation, the client was very satisfied with the proposal submitted by Xinyue, the two parties quickly signed a letter of intent for cooperation. During the Covid-19, in order to ensure the normal progress of customer projects, we will deliver the entire order in batches according to the urgency of the product.

The first batch of products shipped were steel strands and corrugated pipes, which were shipped before the Chinese Lunar New Year. The products arrived on schedule, ensuring the normal development of the project.

This production is the second batch of products – bridge accessories such as anchors. In order to ensure accurate construction and no omissions in size, according to the project construction drawings, Xinyue Technology Department communicated with project engineers repeatedly, from sketch data confirmation, to raw material procurement , production operations and other details, Xinyue strictly follows the engineer’s requirements. All the data of the final product passed the third-party inspection, and it was successfully shipped to the customer’s destination port in early March.

We believe that in the near future, this bridge built with Xinyue products will definitely leave an indelible mark in the history of bridge construction in the Philippines. The success of each project will make Xinyue more firmly towards “Build the World, Serve the Globe”

Written by Susan