Project location:Australia
Product:Flange, bends and bolts etc
Standard and material):ASTM A105; API 5L PSL1 GR.B
Specifications:DN250 300# SO FF;DN250 SCH20
Usage:Mortar transmission project
Inquiry time:2021.06
Order time:2022.2.22
Shipping time:2022.04.15
Arrival time:2022.05.15
In June 2021, we received inquiries from regular customers in Australia. After more than half a year of continuous order tracking, the sales specialist successfully signed the order in March 2022. The ordered items covered DN250 flanges, bends, bolts, nuts, etc., with a total of 20 products, all of which were used in local mortar transportation projects. The goods were complex and the delivery date was urgent. After confirming all the technical details and drawings with the customer, Xinyue quickly ordered the required raw materials. During the production process, due to the spread of the epidemic, in order to cooperate with the government’s epidemic prevention work, it went through a short shutdown, but this did not affect the progress of the contract. At the first time of resumption, the workshop readjusted the production plan, concentrated the productivity and worked overtime in a short time to ensure the delivery of the whole batch of goods on schedule. In early April, the Third-party inspection organization designated by the customer conducted the final inspection of the whole batch of goods, and the inspection data do 100% meet the customer’s order requirements. At present, the goods have successfully set sail for Australia.
Written by April