Project Location: Australia
Product: Retaining rings & End plates
Specification: DN650 Class 600
Standard & Grade:F65 & ASTM A105
Usage: slurry transmission project
Received the inquiry : Aug 2022.
Signed the contract : Sep 2022
Shipped time: Oct 2022
Estimated arrival time: Late of Nov 2022
At the End of Aug, Xinyue received an enquiry of 10tons Retaining rings & End plates from our regular client for mining slurry transmission project in Australia. These products are required to be produced strictly according to client drawing。Since the matched flange has been purchased locally, the required delivery time of these matched products is very urgent, which needs to be delivered to the destination within 8 weeks
Until now, the retaining rings & end plates have been passed the final inspection by TPI, and were well packed & safe loaded by 20ft container, the vessel is well shipping to Australia. The ETA is about Late of Dec. Client highly appreciated our efficient service and timely feedback.
As the famous pipeline supplier from China, Xinyue’s goal is to serve the globe and build the world, warmly welcome to send us inquiry at any time.
Written by April