Project location:Kenya Product:Seamless steel pipe & pipe fittings Standard and material:API 5L GrB PSL1 Specifications:21.3-219mm*12000mm Application:Pipeline construction Inquiry time:2022.01.09 Order time:2022.02.13 Departure time:2022.07.05 Estimated arrival time:2022.09.15 The client is an African project group company. We met in 2020. During that time, xinyue has participated in 4-5 project bids from their company. After frequent communication with customers and video conferences,…
Read More1. Grinding of thick-walled seamless nozzle: After cutting, use an angle grinder to grind the plastic layer of the nozzle. Its purpose is to prevent the plastic layer from melting or even burning during the flange welding process, damaging the pipe, and grinding the nozzle plastic layer with an angle grinder. 2. Thick-walled seamless pipe plastic coating treatment:After polishing,…
Read MoreProject location:UAE Product:PIPE FITTINGS & FLANGE Standard and material: FITTINGS: ASTM A420 WPL6, ASME B16.9 , NACE MR0175 / ISO 15156 FLANGE: ASTM A182 GR F51 ( UNS S31803 ), ASME B16.5, NACE MR0175 / ISO 15156 Specifications:1” – 8” Usage:Oil Transmission Inquiry time:2022.04.13 Order time:2022.05.19 Shipping time:2022.06.20 Estimated arrival time:2022.07.15 This is a purchase of fittings from Dubai…
Read MoreThe order project to be introduced today the project is used in Bangladesh, which is the first cooperation between Xinyue and customers. The products mainly include seamless steel pipes, pipe fittings and thermal insulation layer. Material:ASTM A106 Specification:273mm*9.27mm*6m Usage:hot water and heating supply system project Timeline: Received the inquire on Nov,2021 Signed the contract on Nov,2021 Delivery time…
Read MoreProject Location: Vietnam Products: PIPE FITTINGS Size: 1/2“-16 Standard: ASTM A234 WPB, ASTM A403 F304 etc Inquiry time:10th Mat, 2022 Purchase time: 17th May, 2022 Estimated Shipping time: 17 June, 2022 Estimated Arrival time: 17 July, 2022 This is the first cooperation between the customer and Xinyue in 2018 and has been working together for 4 years.The client is…
Read MoreTianjin Xinyue Steel Group integrates steel pipe production, inventory, and domestic &foreign sales, covering steel pipe galvanizing, anti-corrosion, thermal insulation , and other processing area. who are one of the largest steel pipe and deep processing enterprises in China. This order benefited from the sufficient inventory of Xinyue warehousing base, which Covers an area of more than 80 mu,…
Read MoreConnection method of large diameter spiral steel pipe (SSAW): The common connection method of large-diameter spiral steel pipe is welding, but in some projects, threaded connection, flange connection, socket connection, groove connection and other forms are often used. 1. Welding, flange connection Welding and flange connection are traditional spiral steel pipe connection methods, which are far from meeting the…
Read MoreDegreasing method for stainless steel pipes and fittings: 1. Degreasing method of stainless steel pipe Since the stainless steel pipe only needs to be degreased, in addition to the degreasing method of the carbon steel pipe mentioned above, the large-diameter pipe can also be degreased by wiping. It is not suitable to use cotton yarn when degreasing by wiping…
Read MoreXINYUE STEEL GROUP set up several production bases in Tianjin & Hebei Province, manufacturing ERW Steel Pipe, SSAW Steel Pipe, LSAW Steel Pipe, Seamless Steel Pipe, Scaffolding system and couplers, RHS, SHS, etc.