Project location:Singapore
Product:DI PU PIPE AND FITTINGS
Standard and material:BS EN 545 & BE EN 15655
Specifications: DN1000/1100/1200/1800 ,C25/ K12
Usage:Water treatment plant
Inquiry time: NOV of 2021
Order time:AUG of 2022
Shipping time:FEB of 2023
Estimated arrival time:MARCH of 2023
First of all, we are very honored to participate in the Singapore Water Treatment Plant construction project. There are altogether 6 water treatment plants in this project, and we are the first phase at present.
The inquiry was received at the end of 2021. I participated in the communication of customer drawing design, length and other issues in the early stage. And we also suggested pressure values, confirmed technical data and calculated technical parameters.
And then It will take more than half a year to finalize the plan and confirm the purchase in the second half of 2022.
This purchase is mainly for cast iron pipes and pipe fittings, which require PU coating on the inside and outside surfaces.
It is difficult to produce because the requirement has many specifications and with less quantity. But in order to meet the customer’s project use, we fully support the production, to overcome the difficulties. At present, the production and shipment of the first batch of goods have been completed, meeting the customer’s demand for the first batch of shipments.
We have been adhering to the enterprise vision of building the world and serving the globe. By 2022, we have exported steel products to more than 100 countries, and our steel exports rank the top three.
Thanks to the unremitting efforts of every XINYUE’s people also thank to all customers and partners for their support!