Project Location: Australia
Product: LSAW steel pipe
Specification: DN500
Standard & Grade: EN10219 S355JR
Usage: Jetty piling construction
Received the inquiry in Oct 2021.
Signed the contract on May 2022
Estimated Shipping time: June, 2022
In last Oct, Xinyue received a new enquiry of LSAW steel pipes with Epoxy painting from our regular client for a small jetty piling construction to Australia. The enquiry is very complex, one OD pipe but with several different length and in total quantity only several piles & less than 50tons, also required heavy thickness Epoxy painting. After several months of bidding, design changes and price updates, the project finally made good progress in this February. The end user had verbally awarded the project to our client, but it still needs about several weeks to confirm the specific technical terms and contract details.
Due to the chaos of global shipping in recent years, the congestion situation of various ports is very serious. As a result, the shipping scheduled of break bulk vessel once a month has been delayed to two months now. The earliest ship is in the middle of April this year. If missed this vessel, the next vessel have to wait until June. Therefore, the customer is very nervous about the production delivery time and shipping arrival time. In order to ensure the construction time of this project, we suggest client to cut those piles to short lengths which shorter than 12meter for adapting to containerized shipment, therefore there are more frequent and more abundant shipping options. And Xinyue is willing to spray epoxy paint as the original length required by the customer, as long as the customer butt weld the short pile pipe at the destination port before using.
In early May, the order finally arrived as scheduled. Both the customer and Xinyue are looking forward to the further perfect delivery.