Xinyue Support Vietnam Power Plant Project

Project Location: Vietnam

Products: STEEL PIPE AND FITTINGS

Size: 1/2“-16

Standard: JASTM A234 WPB, ASTM A403 F304 etc

Application: power plant construction

Inquiry time:10th Mat, 2022

Purchase time: 17th May, 2022

Estimated Shipping time: 31 July, 2022

Estimated Arrival time: 14 August, 2022

This order is over ten tons in total, but includes a total of 151 specifications of seamless steel pipe/welded steel pipe /pipe fitting/flange and stainless steel seamless pipe/galvanized pipe/carbon steel fitting/carbon steel flange etc.

From request for quotation, project structure drawings, daily production reports, inspection, storage, shipment, etc., the customer strictly requires detailed documentary support and reports, which need to be sent to the customer for review at the specified time before proceeding to the next step.

After detailed confirmation of details, the two sides reached cooperation on May 17. During the period, we gave the customer 7 drawings of specified elbows and orifice flanges and more than 20 technical documents for review, and gave the customer real-time feedback on production specifics. The customer is very satisfied with Xinyue’s professionalism and meticulous attitude of treating each order seriously, and all the goods have been produced and will be sent to the destination port soon.

For a long time, Xinyue Steel has been committed to resource integration, technology research and breakthroughs in order to better serve our customers and meet your higher needs.